As a placement student I have been working on designing ground models for different projects such as the Wednesbury depot and Cambridge resignalling projects I have also been working in designing long sections for different HS2 assets using a modelli
My role as an Industrial Placement Student within the Foundations and Geotechnics department is to support colleagues on the Scarborough Subway Extension project My tasks are normally to produce CAD drawings extract information from FEA and write report
I complete tasks including design calculations drawings and software development I have also developed learning modules for new employees getting up to scratch with the nuclear department I have developed knowledge in computer based modelling to design
As an Information Management placement student my role is in supporting the development of contractual documents during a projects Tendering phase This in particular involves Digital Strategies and BIM Execution Plans Additionally I am involved in sma
site inspection project management data entry basic design budget control promotion support
I worked a lot on AutoCAD and a bit on Revit coming towards the end of the year I was mainly doing design based worked with a bit of calculation work aswell
Working as an industrial placement student in a geotechnical engineering team my role mainly consists of report writing for the preconstruction phase of various projects I039ve worked on desk studies ground investigation scopes specifications and
I am a working a civil engineer for the infrastructure team I am involved in a spread of projects and mainly work as a modeller
My role within Motts was to work on different projects not just within the bridges and civil structures sector aiding with multiple reports drawings calculations and attending onsite inspections I had a far greater involvement with Mott MacDonald pro
Enter the office and check for emails and teams notifications Then get on with whatever project I am currently working on that may be Markups for updating progress on a drawing or model completing calculations or a report I will usually have a meetin
I work in the energy unit in a civilstructural team I have worked across 2 projects on my placement I have done a some calculations report writing report checking as well as lots of other admin and coordination tasks
I work in the Water team specifically dealing with drainage For projects on HS2 I am a BIM Technician which involves editing and creating plan section and detail drawings It also includes creating models I make Flood Risk Assessments as well as model
Providing digital solutions for information management and adopting new tools to help people processes and technology advance to become more digitally mature in the Engineering sector I help with training clients and users on newly developed tools as
Report writing assisting the PM with projects including commercial tasks attending meetings either for projects or for wider learning completing risk assessments completing inspection reports I also Interact and speak to senior members of staff of ma
Working with members of the team and independently on tasks I am capable of A very wide range of projects has been covered over my 12 months here ranging from the civil asset management of a stadium to maintenance of rail I have worked on niche design
I am in the working in the nuclear industry assigned on a project regarding a research facility I am working alongside the Building architecture team to create deliverables using Revit and am involved in CDP activities alongside other graduates as a star
I work in the Power Process and Nuclear Division of the Energy Unit and within the structures team During my placement I have primarily been on the SMR300 project and this originally entailed of using Eurocodes and previous GDA Submissions as well as C
As a student I was working alongside a professional or multiple Progressing with report writing remediation work defects cost analysis evaluations and attending training and workshops that covered all things civil As I was a short industrial placeme
Use of advanced equipment to measure sound levels precisely Model data for visual presentations Identify the physical source of the noise in question Create summaries of the issues with suggestions for mitigation according to available standard Custom
My position involves using system study applications along with performing calculations to analyse the behaviours of new andor old components within an electrical network Some of the specific studies include load flow studies to analyse the adequacy of