My role is a placement so it evolves learning skills that can then help my team
I work as an Civil Engineering industrial placement student At the moment most of my job involves carrying out hydraulics calculations flood risk assessments handling and producing data sheets and interacting with suppliers In the past months I have
Usually I have project related online meetings with other engineers from different offices Mostly I work on Telemetry and Load schedules as well as MCC sizing
Day to day I usually produce general arrangement drawings on AutoCAD for different bridge structures as well as calculate capacities for reinforced concrete structures Aside from that I also handle lots of smaller tasks such as organising incoming and o
I am an industrial trainee within the waterinfrastructure team This year I have been involved in the design of drainage systems helping out with project management and written reports Day to day will vary based on the project but lots of report writi
In the Transport Buildings Teams Helping out whoever has bits of work for me usually spreadsheet or making diagrams for PowerPoints Gathering information or locating specific documents for people
I am an assistant engineer in the buildingstructures team in Bristol I039ve done CAD drawing financial calculations for project management reportwriting structural analysis and design management
My main role is to support environment and sustainability consultants in the production of environmental reports for large scale infrastructure projects in various sectors including highways rail ports and water I regularly use GIS for mapping and anal
As a highway engineer my role may vary from day to day The general process is that I am given an asset normally multiple and am expected to complete all the requirements necessary for the asset to be ready for checking and then pushed out to be shared
I help a lot with the drainage design in projects using software such as AutoCAD and MicroDrainage to aid my design
This role mainly involves data analysis and manipulation at a junior level with strategic work becoming more prevalent later in the career
As an industrial placement student with the Water team I work on various projects analysing flood risk ad drainage assets and help with the design of drainage strategies I also occasionally perform some project management roles
Day to day activities include attending meetings with various clients and preparing reports design work and drawings Since i just started my placement most of the work is providing CAD drawings and then correcting those drawings based on the comments t
Completing a variety of design calculations talking to clients researching information and writing reports
My role is to assisting with the design of bridges on a concept design project On a day today basis I am sketching designs CAD software and calculating sizing
I design and then produce drawings using MicroStation of the foundations of lineside ancillary civils assets This includes SMIOs UTXs URXs and FSPs In addition to this I annotate any hazards that the workers or operators need to be aware of as well a
I work with the water network Most of my work specifically involves clean water and projects that aim to fix leaks andor reduce the risk of them happening On a day to day basis I will do work on a specific project in this area helping work out a desig
1Depending on the project i am in charge of mainly conducting technical structural engineering design including modelling structural analysis spreadsheet creation 2 Technical reports formal project related documents writing which these document
Cover a variety of roles preparing reports responding to feedback labelling images for innovation development bridge assessment calculations surveying designing Development of models by using range of computer softwares
My roles varied depending on the project but I was tasked with coming up with a hatched design for a possible cycle lane layout which used AutoCAD and looking through various standards For other projects I would sit in on meetings and send out emails